Discharge Pipe
This robust chute-extending pipe is fitted in the bin room directly to the concrete ceiling slab above, ensuring all waste from the chute above is directed and delivered safely into the bin. The anchoring method used to install the pipe to the slab ensures a fire and smoke-tight seal to the slab.
This leap forward from traditional designs negates the need for an auto-closing shutter at ceiling slab level in the bin room (often very difficult to reach / service / repair due to access and height issues) and then a second shutter at the bottom of the discharge pipe.
The bottom of the pipe is manufactured to accept our auto-closing Fire Closure Plate (FCP) and create a complete fire and smoke-tight seal between the pipe and the FCP unit.
Our Hydro Chute discharge pipe design has been tested (BRE) to hold back fire and smoke for 240 minutes, matching the standard of all our chute equipment.
This saves on installation costs and future maintenance / servicing costs, eliminating the need to hire mewps / scaffolding, etc., to negotiate the issues surrounding working at height that have been caused by traditional ceiling-mounted spring-loaded shutters.